In 2024, Al Shrouk for Electromechanical Business and Preparing undertook a pivotal project for Prometeons Inspection Department—the installation of the ZF Machine. This project was critical in enhancing the company’s inspection capabilities. It involved the comprehensive setup of the machine, including the connection of pipelines, installation of valves, and provision of all necessary accessories. The project scope also extended to installing support structures and executing finishing works, such as painting.
To ensure the success of this installation, our team collaborated closely with Prometeon’s technical staff to align the machine setup with their specific operational workflows. Detailed planning and meticulous execution were crucial in integrating the ZF Machine seamlessly into the existing infrastructure, while minimizing disruption to ongoing operations. This collaborative approach was key in delivering a solution that was not only technically sound but also tailored to enhance Prometeon’s operational efficiency.